Tuesday, 19 June 2012

Three Tasks


In this picture Butch and Jamie were explaining to us where the sides and corners of the shed were going to be with the pieces of wood for temporary corners. The string was to make sure the sides and corners were all 90 degree angels and level with the rest of the string so the shed didnt end up on a lean.


This is Jesse and Jamie starting to dig the trenches which were going to be filled with concrete later on. We used pieces of wood to mark out where needed to be dug. The trenches were as wide as shovel width and as deep as the shovel depth too. They were as long as the string we had used to level where the shed would be in the picture before this one.


In this pictures the trenches had been dug and we put barriers up to
hold the placing of where the  cement would go to set as the concrete. The cement was being used to set for the base of the shed as we couldnt put the wood straight on the ground. The barriers were built with everyones hel[p, two at a time putting up the walls, one holding planks and one hammering nails.

No comments:

Post a Comment